These are all the Blogs posted on Wednesday, 9 December, 2020.
Dry Dock Day 1
Bock Marine Beaufort, NC
We were hauled on 12/9/2020 at 1300... We will be getting new bottom paint and some welding on the port side to repair a rusted steel panel under the master head window.
Last winter when replacing windows on the port side we discovered that the master shower had been leaking through the tile... it had been rusting from the inside out and was not even visible until we removed the old window... who know how longs it has been leaking... anyway, need a 12" x 30" section cut out and replaced with a new steel plate and a new stiffener behind it.
Here are some photos of SAILS being hauled and blocked...